Yougu waterproof coating Tixol
The all-round waterproof way, an extraordinary waterproof experience.Exterior wall waterproof paint imported environmentally friendly emulsion, high-quality pigments and fillers processed from a two-component waterproof coating, the coating fully consider the family environmental requirements and design, is the first choice for home decoration waterproof material. Products have good thixotropy, adhesion, storage stability, excellent water resistance, alkali resistance, construction convenience, non-toxic tasteless, green.
Excellent water resistance, alkali resistance, adhesion, continuous fusion performance.
Anti-aging performance and weathering performance is superior.
Hiding power, construction convenience.
Coating film is smooth, delicate, can not afford the skin, does not fall off, dirt-resistant, easy to clean
Implementation standard: GB/T9755-2001 "synthetic resin emulsion exterior wall paint" national standard; GB6566-2001 "building material radionuclide limit" national standard.
Applicable to all kinds of concrete structure of the external walls, can be used for the external walls (including cracks, window frames, balconies, awnings, wall roots, rain pipe interface, etc.), roof, basement, bathroom, all kinds of cement isolation pier and other parts.
Confirm the outer wall of the construction area, the new and old walls of the base surface treatment is different.
Cracks for the external wall to be made separately waterproof reinforcement layer.
Construction of the base surface must be smooth, solid, dry, clean, uneven place available water putty fill level, non-oil base without floating ash.
Exterior wall waterproof coating brushing the wall as a whole twice, staggered vertical construction, the middle of dry solid time 6-8 hours.
Facades to be beautiful decoration, and then put putty twice, staggered vertical construction, the middle of dry solid time 4-6 hours.
Putty layer dry solid, and then decorate the exterior wall paint on both sides of the bottom, the surface color can be deployed according to customer requirements.
Construction instructions
The new plastering wall moisture content of less than 10%, PH value of less than 10.
Construction can be sprayed, painted, brushing, brushing the general two times, painting time 2-4 hours apart.
Stir paint should be used when used with 5% -15% diluted with water.
Construction site temperature is not less than 4 ℃ is appropriate, 0 ℃ following the construction is strictly prohibited.
Construction is completed, the machine should be washed with water immediately.
Company switchboard: 0755-89212007
Fax: 0755-89212007
E-mail: shili.yuan@yougufangshui.com
Company address: Qichuang Low Carbon Park, No. 1034, Longgang Avenue (Pingdi Section), Longgang District, Shenzhen