Yougu waterproof coating Tixol
The all-round waterproof way, an extraordinary waterproof experience.YOOGU metal roofing waterproofing system is composed of the grassroots, surface waterproof coating, sewing polyester cloth, waterproof coating becomes a seamless high resilience waterproof system after curing. Waterproof material 100% pure acrylic emulsion as the base material, add high-quality materials finishing exquisite high-quality waterproof coating designed for all types of roofing and local waterproof design, the waterproof system can be a one-time and thoroughly solve the metal roof longstanding chronic leakage of chronic disease , World-class technology performance. The waterproof system construction is simple, safe, without professional equipment. The professional construction, it will form a durable energy-saving roof seamless waterproof system, in a variety of harsh environments, maintain long-term flexibility, construction is simple, safe, without professional equipment. It will be constructed by professionals who will form a durable, energy-efficient roofing system that offers up to 25 years of quality underwriting, regular maintenance, and extended warranty periods.
YOOGU Metal Roofing Companion Metal Roofing Waterproofing System is a high quality roofing system made of pure acrylic emulsion and other high quality raw materials. It has strong elasticity and UV resistance, reinforced by seamed polyester cloth. Class roofing and partial waterproofing design, such as metal roofing seams, joints and roofs.
Anti-aging: anti-UV, infrared to increase life expectancy, artificial aging laboratory test 3000 hours no change, equivalent to 30 years of natural aging.
Weatherability: -55 ℃ - +88 ℃ temperature environment can be widely used, long-term to maintain good flexibility.
Chemical resistance: can effectively resist the erosion of chemicals and industrial gases.
Tensile, tear-resistant: excellent tensile, tear resistance, can effectively follow the changes in the physical structure of the base surface, especially for deformation of the base surface, cracking and expansion joints waterproof protection, make up for cracks up to 2mm.
Adhesion: Has a strong adhesive force, and the uniform integration of the surface, to achieve 100% of the continuous full James, no channeling water, the formation of the skin seamless waterproof system.
Breathability: The residual moisture on the substrate can be evaporated through the coating.
Environmental protection: Water-based waterproof material, in line with V.O.C odor distribution requirements for sustainable construction.
Anti mold and mildew: excellent long-term anti-mildew, moisture resistance. Durable energy-saving roof seamless waterproof system, in a variety of harsh environments, long-term flexibility to extend the roof life of up to 30 years.
Used in stadium structure, railway station, steel plant, toll stations, gas stations, exhibition galleries and other steel roofing overall waterproofing and local node repair widely used.
It is widely used in metal materials such as steel, aluminum, stainless steel and iron door, glass, lighting tile, aluminum plastic panel, sunshine board, stone, coil, paint, equipment base and concrete. Widely used in the area, is the best metal roofing system today.
Applied to any complex roof node parts: daughter wall, smoke halogen, expansion joints, pipe base, roof vertical lap joints, horizontal lap joints, sink, sink and other equipment base.
Pretreatment of construction
1. Sure good waterproof construction of roof, waterproof construction, first to careful cleaning roof choi steel, must ensure that the base level firmware without loose, without oil, clean, without MingShui, make it clean;
2. The perforation of the color steel plate is patched and repaired, and the modified color steel plate of the warped side is corrected and restored, so that the roof is flat, without breakage, without warping.
3. The screws that have been lost to the colored steel plate are repaired and reinforced, so that they are not loose.
Construction preparation
1. Determine the area of the waterproof treatment and the width of the waterproof layer, and cut the corresponding width of the reinforced polyester cloth.
2. The paint should be evenly stirred when used, but no need to be used for water or auxiliary materials.
3. The construction time can be brushed, rolled and scratched, and the related working tools should be prepared, and the necessary measures for labor protection should be done.
Construction process (3)
A coat of acrylic acid high elastic base waterproof coating on a well-cleaned base surface.
A cloth: when the waterproof coating on the base is still wet, it will be laid on the coating.
Two coating: then in silk weaving polyester cloth surface besmear brushs a acrylic high elastic flexible waterproof coating at the grass-roots level, let the paint fully infiltrates silk polyester cloth, make sure can't afford to drum, not wrinkle, make coating can be fully with the underlying the gap by silk polyester cloth coating as a seamless whole, the combination of dry solid.
Three coating: on dry solid coating surface, paint with acrylic anti-ultraviolet coating waterproof coating, even dry.
specifications
Reference usage: basic theory of paint coating a 45 ㎡ / 20 l; The actual utilization rate of filament polyester fabric is 90%; The theory of surface coating coated 55 ㎡ / 20 l. The actual consumption amount is determined according to the construction conditions and the conditions of the base material.
Construction tools
Agitator, hard brush (not using wool brush), scraper, roller, etc. Wash with clean water immediately after construction.
Construction environment
This product is suitable for temperature in 5 ℃ ~ 45 ℃, humidity under the condition of less than 85% of the construction of more than environmental conditions when crossing construction. Rain, snow and hail are not suitable for construction. Please pay attention to weather forecast ahead of time.
Company switchboard: 0755-89212007
Fax: 0755-89212007
E-mail: shili.yuan@yougufangshui.com
Company address: Qichuang Low Carbon Park, No. 1034, Longgang Avenue (Pingdi Section), Longgang District, Shenzhen