Building waterproofing scheme

The all-round waterproof way, an extraordinary waterproof experience.
Steel structure waterproof Concrete Roof Waterproofing Sink Roof Waterproof Exterior Roof Waterproofing Kitchen And Bathroom Roof Waterproof

Application range

It is suitable for sinks, gutters, foundation pits, water storage tanks, sewage tanks, flower and wood enclosures of various metal structures and concrete structures.

Product description

YOOGU water tank special waterproof coating is a two-component high-performance new waterproof coating made of organic polymer liquid material and inorganic powder.It has the advantages of high elasticity, water resistance, weather resistance, durability and so on. , Used in conjunction with polyester cloth to form a high-strength and tough waterproof layer. The sink is the place where metal and concrete building structures are most prone to water leakage. Degumming, rust perforation, rust, welding seams, etc. around the drain will cause water leakage. This product is designed for long-term use of the sink in a humid environment. First material.

Features

It is a water-based, non-toxic, odorless, harmless, non-flammable, non-corrosive green environmentally friendly product.

Long-term bubble resistance, weather resistance, aging resistance, tensile resistance, ultraviolet radiation resistance, good acid and alkali resistance.

It can be used directly on the surface of the substrate without the need for a protective layer. It can be used directly exposed and can be strongly bonded with different materials.

The product is flexible from -35°C to +120°C after curing, with fast curing speed and good adhesion.

No protective layer is required, and the coating material stretches and compresses freely.

Liquid cold construction can form a perfect seamless waterproof system with the base surface.

Anti-ultraviolet, the surface and the waterproof layer have good weather resistance.

Can be used for various complex nodes, easy to construct.

Long-term resistance to water immersion, long-term resistance to salt water, alkaline water and low acid corrosive sewage immersion.


Construction method (three coats and one cloth)

20180103013809_51127.png

Standard construction process

Base surface pretreatment:

Carefully clean the construction base surface during construction, polish and remove rust and corrosion on the sink, and clean it up.

It must be ensured that the base surface of the sink is flat, the firmware is free of looseness, no rust, no oil, no dust, and no clear water to keep it clean. Firmware with loose base surfaces must be replaced or reinforced.

For coagulation: the uneven surface of the soil sink, thicken the cement paste, level it with a batch knife-once, the thickness of the batch is less than 5mm, please note that it is not suitable to block too thick every time, the cracks need to be added with this product first Floor. The arc of the Yin and Yang corner hard seat is treated with a waterproof additional layer.


Construction preparation:

Determine the parts to be waterproofed and the width of the waterproof layer, and cut the polyester cloth of corresponding width.

The paint needs to be stirred evenly when it is used, but no additional water or auxiliary materials are needed, and it can be applied directly.

During construction, brushing, rolling and scraping can be carried out. Related working tools should be prepared and necessary measures for labor protection should be done.


Construction method (three coats and one cloth):

1. Mix the YOOGU water tank paint uniformly according to the proportion, and cut the polyester cloth with corresponding width. The construction base is cleaned up.

2. One coat: Brush the stirred water-resistant acrylic waterproof coating on the cleaned base surface.

3. One cloth: While the coating is still wet, lay the polyester cloth on its surface and compact it with a brush.

4.Secondary coating: Then apply the second layer of water-resistant acrylic waterproof coating on the surface of the polyester cloth, and allow the waterproof coating to fully penetrate the polyester cloth, so that the two-coat and one-cloth waterproof layer is integrated and dried to ensure the coating. The layer is uniform, wrinkle-free, full and tightly closed.

5. Three coats: After the second coat-the cloth is dried and solidified, then apply a water-resistant acrylic surface layer water-proof paint to the sink.


Case construction comparison


20171226071420_17569.jpg

Company switchboard: 0755-89212007

Fax: 0755-89212007

E-mail: shili.yuan@yougufangshui.com

Company address: Qichuang Low Carbon Park, No. 1034, Longgang Avenue (Pingdi Section), Longgang District, Shenzhen

$erweima
Scan to enter the mobile terminal
版权所有 ©深圳市优固建筑防水有限公司case number:粤ICP备18003350号